Clamp-All Couplings are quick and easy to
install. Simply follow the instructions noted below.
   
Step 1 - The cut ends of the
pipe should be smooth and square.
Step 2 - Place neoprene gasket
on end of pipe or fitting until it is firmly seated against the center
stop.
Step 3 - Place stainless steel
housing with clamps on end of other pipe and slip the pipe into the gasket
until it is also firmly seated against the center stop.
Step 4 - Slide the housing into
position directly over the gasket. Using preset torque wrench,
alternately tighten clamps to torque required by model.
Recheck torque on all clamps before proceeding to next installation to
assure an even and proper torque.
Hanging Hubless
Cast Iron Soil Pipe and Fittings joined by Clamp-All Couplings may be hung
with one hanger per length where allowed by code. Vertical
Piping shall be supported at each stack base and at each floor. Free
standing vertical pipe should be adequately staked or braced during
construction to maintain alignment in accordance with local codes. Horizontal
Piping shall be supported within 24 inches of the coupling joint at 10
foot intervals for 10 foot lengths of pipe and at 5 foot intervals for 5
foot lengths of pipe and at every third fitting where they are
contiguous. Supports or hangers should be properly placed to
maintain alignment and grade with provision made to prevent shear
Horizontal runs of pipe 5" diameter and larger must be braced at
changes of direction and sway braced as necessary to prevent horizontal
movement and maintain alignment..
Installation of Clamp-All couplings
must be in accordance with our printed installation instructions and in
conformance with local code requirements. Pre-set
Torque Wrench Clamp-All
manufactures Pre-set torque wrenches and requires their use for proper
installation For
proper installation of Clamp-All HI-TORQ 80 Couplings use Part Number
99080 & 99125 Torque Wrench For
proper installation of Clamp-All HI-TORQ 125 Couplings use Part Number
99080 & 99125 Torque Wrench |